No. | Class | Target | Title | Lang. | Type | Ver. | Date/ current | Date/ 1st |
0001 | Design | E | Bio-safety facilities,Air-conditioning, Plumbing, and Electrical system | E,J | doc | 17 | 04/01/2021 | 16/08/2007 |
0002 | Maintenance | U | Inspection of Mobile BSL3 Lab in PIHCMC | E,J | ppt | 1 | 21/07/2019 | |
0003 | Design | E | Specification of Mobile BSL3 Lab in PIHCMC | E,J | xls | 7 | 12/10/2019 | 30/06/2006 |
0004 | Operation | U | Effective learning style | E,J | ppt | 2 | 03/08/2021 | 11/10/2019 |
0005 | Operation | U | Why is SOP needed? | E,J | ppt | 2 | 03/08/2021 | 11/10/2019 |
0006 | Design | E | Alarm list of BSL3 Lab | E,J | xls | 4 | 09/08/2021 | 11/10/2019 |
0007 | Design | E | HEPA Filter | E,J | ppt | 4 | 01/09/2021 | 22/02/2020 |
0008 | Design | E | Air Change Rate in BSL3 Lab | E,J | ppt | 3 | 03/08/2021 | 22/02/2020 |
0009 | Design | E | Air Tightness in BSL3 Lab | E,J | ppt | 4 | 28/07/2022 | 17/02/2020 |
0010 | Design | E | Room pressure control and Air volume control in BSL3 Lab | E,J | ppt | 6 | 25/01/2022 | 20/10/2019 |
0011 | Design | E | Energy saving in BSL3 Lab | E,J | ppt | 3 | 03/08/2021 | 22/02/2020 |
0012 | Design | U,E | Specification for Bidding of BSL3, ABSL3 Lab in PIHCMC | E | ppt | 7 | 31/07/2020 | 25/02/2020 |
0013 | Design | U | Terms of Reference for Bidding of BSL3, ABSL3 Lab in PIHCMC | E,J | doc | 2 | 07/03/2020 | 25/02/2020 |
0014 | Maintenance | E | Energy saving way in Mobile BSL3 Lab in PIHCMC | E,J | ppt | 3 | 05/11/2021 | 28/08/2019 |
0015 | Maintenance | U | Inspection of BSL3 Lab in NIHE HTC | E | 1 | 18/06/2021 | ||
0016 | Design | E | Specification of CTL (Containerized Tubercrosis Laboratory) | E,J | xls | 5 | 11/06/2013 | 31/07/2012 |
0017 | Design | E | Specification of CBSL3 (Containerized BSL3) | E | 6 | 30/06/2017 | 31/10/2016 | |
0018 | Construction | U | Construction Progress of BSL3, ABSL3 Lab in PIHCMC | E,J | 14 | 17/01/2022 | 02/07/2021 | |
0019 | Design | E | Control System of BSL3 Lab | E,J | ppt | 5 | 04/08/2021 | 05/07/2021 |
0020 | Construction | E | Trial Operation of BSL3 Lab | E,J | ppt | 3 | 07/11/2021 | 27/07/2021 |
0021 | Operation | U | About Mobile BSL3 Lab in PIHCMC | E,J | ppt | 3 | 12/08/2021 | 08/07/2013 |
0022 | Operation | U | SOP for Mobile BSL3 Lab in PIHCMC (Entering and leaving Procedure) | E,J | doc | 1 | 12/07/2013 | |
0023 | Operation | U | TIPS to make SOP | E,J | ppt | 2 | 01/09/2021 | 06/08/2021 |
0024 | Design | U,E | Lab Design in BSL3 | E,J | ppt | 3 | 06/11/2021 | 15/07/2014 |
0025 | Operation | U | SOP for Mobile BSL3 Lab in PIHCMC (Standard Operation) | E,J | doc | 1 | 12/07/2013 | |
0026 | Operation | U | SOP for Mobile BSL3 Lab in PIHCMC (Standard Procedure on HEPA filter replacement) | E,J | doc | 1 | 12/07/2013 | |
0027 | Operation | U | SOP for Mobile BSL3 Lab in PIHCMC (Standard Inspection order) | E,J | doc | 1 | 12/07/2013 | |
0028 | Maintenance | U | Maintenance Item List of BSL3 Lab | E,J | xls | 2 | 11/11/2021 | 10/08/2021 |
0029 | Maintenance | U | Assessment of BSL3 lab operation in NIHE HTC | E,J | ppt | 1 | 02/07/2019 | |
0030 | Maintenance | U | Additional assessment of BSL3 lab operation in NIHE HTC | E,J | ppt | 1 | 03/07/2019 | |
0031 | Design | U,E | 3D (dimension) model | E,J | ppt | 2 | 11/08/2021 | 29/01/2018 |
0032 | Design | U,E | Water Volume from Faucet 13mm | E,J | xls | 2 | 01/09/2021 | 11/08/2021 |
0033 | Operation | U | PIHCMC training needs and NIHE training | E,J,V | xls | 3 | 14/10/2021 | 31/08/2021 |
0034 | Operation | U | CanTho Univ. training needs and NIHE training | E,J,V | xls | 1 | 31/08/2021 | |
0035 | Design | U,E | Lab Maker (Outline) | E,J | ppt | 1 | 30/09/2021 | |
0036 | Design | E | Lab Maker (Detail) | E,J | doc | 4 | 31/12/2021 | 30/09/2021 |
0037 | Design | U,E | Lab Maker (Excel with macro) | E,J | xls | 3 | 31/12/2021 | 30/09/2021 |
0038 | Design | U | 3D model of BSL3, ABSL3 Lab in PIHCMC | E | wrl | 3 | 11/11/2021 | 18/10/2021 |
0039 | Operation | U | Regulation on safe management of pathogens | V | 1 | 18/10/2021 | ||
0040 | Design | E | UV Lamp Timer additionally installed in Pass box | E,J | ppt | 1 | 24/11/2021 | |
0041 | Design | U,E | UV Lamp | E,J | ppt | 3 | 06/12/2021 | 24/11/2021 |
0042 | Maintenance | E | Formaldehyde gas fumigation | E,J | ppt | 6 | 03/11/2023 | 23/04/2003 |
0043 | Maintenance | E | Formaldehyde gas fumigation (Excel Back data) | E | xls | 2 | 01/11/2023 | 14/12/2021 |
0045 | Construction | U,E | Handover in BSL3 Lab | E,J | ppt | 1 | 15/12/2021 | |
0046 | Construction | U,E | Work Report in PIHCMC | E,J | ppt | 1 | 25/01/2022 | |
0047 | Maintenance | U,E | How to check whether Pressure gauge is broken or not | E,J | ppt | 1 | 24/04/2022 | |
0048 | Maintenance | U,E | Technical Point in BSL3 Lab facility | E,J | ppt | 1 | 24/10/2022 | |
0049 | Maintenance | U,E | Risk Assessment Table | E,J | xls | 1 | 24/10/2022 | |
0050 | Maintenance | U,E | HEPA filter Repacement | E,J | ppt | 4 | 07/11/2023 | 12/07/2013 |
0051 | Maintenance | U,E | Filter Maintenance | E,J | ppt | 1 | 05/11/2023 |